fr en
Solutions for Passive, Thermal and Protection      Short lead times     French distributor

Termination Change

Ag/Pd Sn/Pb Cu/Sn SAC Medical, Space applications

If you're in possession of components with a regular termination but need one that's more reliable or simply different, we are able, by dipping, to safely change the existing termination. Our electrolytic bath can remove the existing termination while maintaining the component's integrity.

For your leaded components, only tin-lead and sac 305 are available.

This service is available with very short lead time : Count 1 to 2 weeks to receive your parts.
 
                     Contact Us
               +33 2 54 67 50 58
              
                  Cross References
 
             Downloads   
            ISO
          Rohs
          Reach
Plus d'Infos

Download our brochure